主页 > News > Company news > Cheaper price liquefied gas (lpg gas) delivery truck for sal
Cheaper price liquefied gas (lpg gas) delivery truck for sal
Release time:2021-04-22 17:42 Editor:truckdf From:Chengli
Cheaper price liquefied gas (lpg gas) delivery truck for sale 

The liquefied gas Tank vehicle is the special-purpose vehicle that be designed to transport liquefied gas in above-second-class highway. Its design, fabrication, testing and inspection, and acceptance is accorded to ‘Supervision Rules for Safety of Liquefied Gas Auto Tanker’, ‘Supervision Regulations on Safety Technology of Pressure Vessels’, GB150-1998 ‘Steel Pressure Vessels ’。It has many advantages, such as safe and reliable, economical and practical and overhauls conveniently.
 
Because of medium danger, for assuring safe operations, the user shall strictly confirm to the relative rules of ‘Supervision Rules for Safety of Liquefied Gas Auto Tanker’, ‘Supervision Regulations on Safety Technology of Pressure Vessels’ and ‘Operation Instruction of Liquefied Gas Tank vehicle..
 
1, The operation and maintenance of chassis is shown on “Operation Instruction
of Chassis”.
Structure and Technical specification
2.1, The tank is equipped with, safety valve, indicator for liquid level, urgency switch valve, valve box, side protecting rail, etc., see Fig. 1 and Table 1 in its structure.
2.2, Main technical specification of the tanker is shown as Table 2 ‘liquefied gas Tank vehicle list of main technical specification’.
2.3The tank is one important part of the liquefied gas semi-trailer. The tanker is consisted of the cylinder shell and standard ellipsoidal head. The tank’s material is high intension steel plate 16MnR that is specially used in pressure vessel. The double side auto-welding is adopted in tank’s main welding joints. The 100% x-ray checking shall be done to A and B kinds welding joints and shall accord with Ⅱ grade requirements of JB4730 ‘Non-destruction testing for Pressure vessels’. The fully magnetism checking or penetrate checking shall be done to C and D kinds welding joints and shall accord with Ⅰ grade requirements of JB4730. PWHT shall be done after the welding of tanker . The hydraulic test shall be done after the post-weld heat treatment. The manhole of the tank is used for cleaning and maintenance of the tanker’s inside. The baffles are mounted on the tanker’s inside to prevent wave. The seat is welded on the tank’s bottom. The structure of the tank is shown as Fig. 2 and Table 3.
After tanker assembly, have carried on the gas leak test to the complete vehicle according to the design pressure, authorize third party to have qualification supervise after examining by country-qualified making available to the users.

Lists of Liquefied Gas Tank vehicle main structure parts

NO.   NAME
1   protecting rail
2   chassis
3   Tank
4 Safety valve
5   Indicator of Liquid level
6   Manhole
7    Hand grenade
8 Rear safety bar
9 Grounding adhesive tape
10   Rear protecting rail
11 Plate for protecting tyre
12 Valve box and operation system

 
List of tank’s main structure parts




1   Head
2   Flying rings
3   Shell
4 Baffles
5 Safety valve
6 Indicator for liquid level
7 Manhole
8   Drain hole
9   Pipe for liquid phase
10   Pipe for thermometer
11   Pipe for gas phase
 

About us - Contact Us - Search - Site map - Feedback

Chinese well-known Landscaping, petrochemical, municipal sanitation, pressure vessels,

special purpose vehicle manufacturer.--Chengli Special Automobile Co., Ltd. Free service hotline: 400 0606 829

Add: South Suburb, Chengli Automobile Industry Park, Suizhou City, Hubei Province, China.

360网站安全检测平台 安全狗网站安全检测